San Jose's office relocation company since 1990. A dedicated project manager, evening and weekend execution, and your team back at their desks Monday morning.

An office move is a business operation with a deadline, not a bigger version of a household move. Payroll runs, customers keep calling, and the network has to come back up. So we plan it the way your operations team would: sequence, owners, contingency.
Silicon Valley Moving & Storage has moved Bay Area offices since 1990, from single suites to multi-floor consolidations, with our own commercial crews and a dedicated project manager who answers for the result.
The plan covers every cable, every access badge, and every after-hours elevator reservation. The Monday after the move gets planned in the same detail as the weekend itself.
Facilities leads plan projects for a living, and a mover who cannot show a plan is asking to be trusted on decor. Here is ours, milestone by milestone, for a representative office move.
Typical project
50-workstation office
Lead time
8 to 12 weeks
Execution
One weekend
12 weeks
Both addresses surveyed: dock and elevator access, badge protocols, what is moving and what is not. Large moves start here 8 to 12 weeks out; smaller offices compress to 3 or 4.
6 weeks
Crew count, trucks, phases, and the off-hours schedule, priced in writing before you sign anything.
4 weeks
Every workstation lands numbered on the destination plan, and the cutover window is set with your IT team, not for them.
2 weeks
COI filed with both property managers, freight elevators reserved, dock windows booked. Your landlord hears from us, not about us.
The weekend
Friday evening to Sunday night: disconnect, wrap, load, transport, reconfigure to the plan, reconnect, and power-on verification.
Monday
Your team badges in to a working office, and your project manager walks the punch list with you.
Milestones from a representative project. Your written quote carries the actual dates, phases, and crew plan for your move.

Commercial buildings do not let a mover in the door on goodwill. Property managers at both ends will ask for three things, and handling them is part of the job:
And for what happens if a monitor or a conference table is damaged in transit: how valuation works explains the coverage every mover operates under. Two minutes, worth reading before you sign with anyone.
The four workstreams inside nearly every office move, carried by one crew under one project manager.
Full-cycle technology relocation from disconnect through reconnect. We coordinate with your IT staff on cutover windows.
We disassemble, transport, and reconfigure modular office furniture to your new floor plan.
Coordinate household moves for transferring employees, scheduled around their start dates.
Synchronize schedules, equipment, and crews across multiple locations with a single project manager.

We staff evening, overnight, and weekend crews for office clients as standard. You give us your business calendar, we build the schedule against it, and your written quote prices the off-hours work before you commit.
Most Bay Area office moves are executed Friday evening through Sunday night so employees walk into a fully operational workspace Monday morning. We staff these moves with our most experienced commercial crews and a dedicated on-site project manager throughout.
Whether you need a phased multi-weekend move or a single all-in Friday-night push, we plan it, staff it, and execute it against a written quote that states the schedule and the cost before you sign.
Most office moves start from one of these situations, and each one changes how we sequence crews, equipment, and downtime.
Merging several floors or sites into one headquarters, where the furniture plan and headcount keep changing up to the final week.
Expanding onto an additional floor or suite while the existing team keeps working through the transition.
A hard exit date set by the landlord, where the move-out and the move-in have to be sequenced against each other.
Combining two office populations onto one floor plan, with mixed furniture systems and two different IT stacks.
Several Bay Area offices moving on a shared schedule, or one large move phased across consecutive weekends.
Relocating a single team or room within the same building or campus without disrupting everyone around it.
Moving out entirely rather than in? That is office decommissioning. Reconfiguring continuously rather than relocating once? That is Move, Add & Change.
Project-quoted, not a flat rate, because these six things move the number more than anything else:
You get a written, itemized quote: crews, trucks, phases, and schedule. If the scope changes, the quote changes in writing, not on the invoice.
Storage
30–90 day staging during a relocation. FF&E receiving before the new space is ready. Project-based commercial storage in our Bay Area facility. Same crews handling the move handle the storage.
There are four other ways companies handle an office move. Each one is right for somebody, so here is where each fits and where we do.
Book a national van line directly
When it fits
A single interstate HQ move where the long-haul network matters more than local coordination.
With SVM
You get the same Bekins network through us, plus a local crew and a project manager who walk your actual buildings.
Run it with an in-house facilities PM
When it fits
You have move experience on staff and only need labor and trucks.
With SVM
We slot in as the crew under your plan, or carry the plan for you. Both are quotable.
Hire an IT-only relocation vendor
When it fits
A pure server-room move with no furniture, no employees, and no building logistics.
With SVM
One contract covers the racks, the desks they sit next to, and the elevator both need.
Fold it into the general contractor's buildout
When it fits
The move is a small line item inside a larger construction project.
With SVM
GCs subcontract the moving anyway. Contracting it directly means the mover answers to you, not to the GC's schedule.
| The option | When it makes sense | What we do differently |
|---|---|---|
| Book a national van line directly | A single interstate HQ move where the long-haul network matters more than local coordination. | You get the same Bekins network through us, plus a local crew and a project manager who walk your actual buildings. |
| Run it with an in-house facilities PM | You have move experience on staff and only need labor and trucks. | We slot in as the crew under your plan, or carry the plan for you. Both are quotable. |
| Hire an IT-only relocation vendor | A pure server-room move with no furniture, no employees, and no building logistics. | One contract covers the racks, the desks they sit next to, and the elevator both need. |
| Fold it into the general contractor's buildout | The move is a small line item inside a larger construction project. | GCs subcontract the moving anyway. Contracting it directly means the mover answers to you, not to the GC's schedule. |

Multi-state office relocations run through our Bekins Van Lines agency. Whether you are consolidating regional offices, expanding into a new market, or relocating headquarters across state lines, you keep a single point of contact here in San Jose, backed by a national network of crews held to the van line's standard: background-checked, clean driving records, and trained to it.
“I've been working with Silicon Valley Moving and Storage for quite some time now and all of my clients have had nothing but amazing things to say. The moves are always seamless — a ton of attention to detail, wrapping furniture and art pieces as if it were their own. Professional and efficient!”
Natalie C.
March 2026
“The team at Silicon Valley Moving and Storage is top notch. Very professional, hard working, and trustworthy. They helped us with a short distance move on two separate days. I would absolutely use them again and give them my highest recommendation.”
Brian K.
January 2026
“Got a quote for a last minute move. Had some exercise equipment moved from Stockton to San Jose. They were super responsive. The move went great — timely and organized. The two people that moved the equipment were fantastic. Would definitely use again.”
David H.
February 2026
A few desks or a single conference room costs less as an hourly labor job than as a project-managed relocation, and we will tell you that rather than quote you a project. National multi-state facilities contracts that need permanent staff in every market are a better fit for an enterprise facilities firm. Certified records destruction with chain-of-custody requirements goes to a NAID-certified shred vendor, and we coordinate that partner rather than claim it ourselves.
And when the office sits attached to a warehouse or production floor, the machinery side is its own discipline: industrial relocation. When one of those is the better answer, you will hear it from us during the walkthrough.
For moves involving 50 or more workstations, we recommend 8 to 12 weeks of lead time so we can complete site surveys, coordinate with building management at both locations, and order any specialty materials. Smaller office moves can often be planned in 3 to 4 weeks.
Yes. We handle single racks through full server-room moves: disconnect, label, cushion-wrap, transport, reconnect, and power-on verification, with the cutover scheduled inside a maintenance window your IT team picks.
Yes. Our crews disassemble modular workstations, benching, and cubicle systems at the origin, reconfigure them to the new floor plan at the destination, and manage surplus furniture disposal or storage.
We carry comprehensive general liability coverage and issue a certificate of insurance naming your building promptly upon request, at both origin and destination. Freight elevator reservations and dock scheduling are coordinated directly with the property managers as part of the plan.
Every office move plan includes built-in contingency time, and your project manager adjusts crew allocation in real time if unforeseen issues arise. Schedule risks get raised with your facilities team as they appear, not after the fact.
Yes, multi-site relocations are a core competency. We assign a dedicated project manager who synchronizes schedules, equipment, and crews across all locations. Through our Bekins network, we also handle interstate office moves anywhere in the country.
Tell us the two addresses, the headcount, and the date you have in mind. A project manager comes back with a walkthrough time and a written quote.